Skip to content
Business Opt

Cubic metre calculator for skips and deliveries

Work out a volume in cubic metres, litres, cubic feet and cubic yards, then what it weighs in concrete, Type 1, screed, sand, gravel or topsoil. There is nothing to pay and no login. What you enter is remembered by your browser, not sent to us.

  • Box, cylinder or slab with a depth in mm
  • m³, litres, ft³ and yd³ in one go
  • Tonnes from each material's sourced density

Choose the shape, enter the sizes, and pick a material if you need the weight.

Shape
2.7 m³Cubic metres
2,700 LLitres
95.35 ft³Cubic feet
3.53 yd³Cubic yards
5.94 tMOT Type 1, by weight
The working
Volume2.7 m³
× 1,0002,700 litres

Weights use typical densities; dug soil bulks up by a fifth or more once it is out of the ground, so allow for that when booking a skip or grab lorry.

How to work out cubic metres: the sum

Multiply length by width by height, all in metres, and the answer is in cubic metres (m³). For a slab or a dig, the height is the depth, so 150mm goes in as 0.15m. Times the m³ by 1,000 for litres. Times it by the material's density in tonnes per m³ for the weight you will be ordering or carting away.

The calculator opens on a driveway sub-base: 6m long, 3m wide and 150mm deep, in MOT Type 1.

  • Volume: 6 × 3 × 0.15 = 2.7m³.
  • In litres: 2.7 × 1,000 = 2,700 litres.
  • In cubic feet: 2.7 ÷ 0.0283168 = 95.35ft³.
  • In cubic yards: 2.7 ÷ 0.7645549 = 3.53yd³.
  • Weight: 2.7 × 2.2 tonnes per m³ = 5.94 tonnes of Type 1.

Boxes, cylinders and slabs

Three shapes cover most of what gets dug, poured or filled on a job. The How many box multiplies the answer, so six identical post holes are one entry, not six.

Box or hole

Length × width × height. Use it for a trench, a skip's load, a raised bed or a room. A footing trench 6m long, 0.6m wide and 1m deep is 3.6m³ of spoil to get rid of.

Cylinder or round hole

π × radius² × height, with the radius half the diameter. A round tank 1.2m across and 1.5m deep holds 3.1416 × 0.6 × 0.6 × 1.5 = 1.696m³, which is 1,696 litres.

Slab (depth in mm)

Length and width in metres, depth in millimetres, because that is how bases, screeds and sub-bases are specified. The calculator divides the depth by 1,000 for you.

Cubic metres to tonnes: it depends what's in it

A cubic metre of water weighs a tonne. Almost nothing on a building site does. Multiply the m³ by the material's density to get tonnes, and the density changes a lot from one material to the next. These are the figures the calculator uses. Each comes from a UK supplier. The tool does not let you change them, so if your own supplier quotes a different density, multiply the m³ by theirs.

  • Concrete: 2.4t per m³. Tarmac gives 2.3 to 2.4t for a cubic metre of standard concrete, and 2.4 is used here.
  • MOT Type 1: 2.2t per m³. The factor in Breedon's aggregates calculator, applied to the depth you measure once it is laid. Loose in a bag it is lighter.
  • Sand and cement screed: 2.0t per m³. Flowcrete's K-Screed data sheet gives its K-Screed, a semi-dry screed laid with sand, a density of about 1.8 to 2.0t per m³, and the higher one is used here.
  • Sharp sand: 1.7t per m³. M&P Moran describes its sharp sand bulk bag as about 0.5m³ and 800 to 850kg. Divide one by the other and you get 1.6 to 1.7t per m³.
  • Gravel: 1.6t per m³. Carvers uses 1.6 for standard gravel, 1.75 for crushed and 1.5 for decorative.
  • Topsoil: 1.5t per m³. Rolawn says a tonne of standard topsoil is about 0.67m³, and 1 ÷ 0.67 is 1.49.

Skips and muck-away: allow for bulking

Ground swells when you dig it. A hole that measures 4.5m³ does not fit in a skip that holds 4.5m³, because broken-up soil takes more room than it did packed in the ground. Work out the dig in m³, add the bulking, then turn it into cubic yards, which is how UK skips are named.

The British Geological Survey groups bulking by material: sand, gravel and soft clay or silt swell by 5 to 20%; firm clay and silt by 20 to 40%; weak rock by 40 to 55%. Put your figure in the Bulking once dug box and the calculator adds a loose volume, in m³, beside the dug volume. The weight does not change when soil bulks, so the tonnes stay the same.

Take a dig for a driveway 6m by 3m, down 250mm into firm clay. That is 4.5m³ in the ground. At 30% bulking it becomes 5.85m³ loose. The tool gives the loose figure in m³ only; divided by 0.7646, it is 7.65 cubic yards.

  • Skip sizes in m³: a cubic yard is 0.9144 × 0.9144 × 0.9144 = 0.7646m³, so a 2-yard skip holds 1.53m³, a 4-yard 3.06m³, a 6-yard 4.59m³ and an 8-yard 6.12m³.
  • Heavy waste: ISM Waste says a 6-yard skip is the largest that can be filled entirely with heavy waste such as soil, rubble and bricks. On that firm's rule, the 7.65 yards of clay above needs two 6-yard skips, not one 8-yard.
  • Weight on the lorry: soil dug from the ground is denser than the screened topsoil a supplier delivers, so the topsoil figure will understate it. Ask the muck-away firm what weight per load they work to, and use their figure rather than the tool's tonnes.

Ordering a delivery by the cubic metre

Merchants sell aggregates by the tonne, by the bulk bag or by the loose load, and ready-mix concrete by the m³. Work out the m³ here, then check how your supplier sells it. A bulk bag sold as a tonne bag usually holds nearer half a cubic metre, like the sand bag above.

The Add for waste box adds a percentage to the volume and the tonnes, for spillage, uneven ground and compaction. It starts at 0%, so you see the bare volume first. Each material calculator applies its own allowance and rounds up to whole bags and loads:

Concrete

The concrete calculator takes slabs, footings and post holes, and tells you how much ready-mix, how many bags, or what cement and ballast to buy.

Sub-base, gravel and soil

The Type 1 calculator, gravel calculator and topsoil calculator turn an area and a depth into tonnes and bulk bags, with an allowance for compaction or settling.

Screed

The screed calculator turns a floor area and a depth into the sand and cement bags, or the liquid screed, you need.

Where the numbers can be off

It measures regular shapes from the sizes you give it. Real digs and bases are rarely perfectly level, and a slab that is 10mm deeper than planned over a large area adds up fast. Take several depth readings and use the average, or the deepest if you would rather not run short.

  • Densities are typical, not certified. Moisture, grading and the quarry all change them. The supplier's weighbridge ticket is the real figure.
  • No compaction maths. Type 1 is ordered by the compacted depth here. The Type 1 calculator handles the extra for compaction.
  • Skip rules vary. Weight limits, what counts as heavy waste and how full you may load a skip are set by each hire firm. Check before you book.
  • Freight is different. Couriers and shippers work in cubic metres too, but they also charge by volumetric weight, which this does not calculate.

Common questions

How do I calculate m³?

Multiply length × width × height, with every measurement in metres. A box 2m by 1.5m by 0.5m is 1.5m³. If you measured in centimetres, multiply the three numbers and divide by 1,000,000.

What is the volume of a 3 × 3 × 3 cube?

27 cubic units. A cube 3m each way is 27m³, which is 27,000 litres or 35.3 cubic yards. A cube 3ft each way is 27 cubic feet, which is exactly one cubic yard, or 0.76m³.

How do I convert cubic metres to tonnes?

Multiply the m³ by the material's density in tonnes per m³. One m³ of concrete is about 2.4 tonnes, Type 1 about 2.2, sharp sand about 1.7 and topsoil about 1.5. Water is 1.0.

How many litres are in a cubic metre?

1,000. A litre is a cubic decimetre, a cube 10cm each way, and NIST lists it as exactly 0.001m³.

How many cubic metres are in a skip?

Skips are named in cubic yards, and one cubic yard is 0.7646m³. A 4-yard skip holds about 3.06m³, a 6-yard about 4.59m³ and an 8-yard about 6.12m³. Allow for the soil or rubble bulking up once it is dug.

How do I work out the volume of a cylinder?

Halve the diameter for the radius, square it, multiply by π (3.1416), then by the height. A post hole 300mm across and 600mm deep is 0.0424m³. Six of them are 0.2545m³, about 0.61 tonnes of concrete.

Is m3 the same as cubic metres?

Yes. m³, m3, cu m and cbm all mean cubic metres. A cubic metre is a cube 1m long, 1m wide and 1m high.

How do I convert cubic feet to cubic metres?

Multiply cubic feet by 0.0283168. A cubic foot is 0.3048m × 0.3048m × 0.3048m, which is 0.028316846592m³. Going the other way, one m³ is 35.31 cubic feet.

Want the reviews to look after themselves?

We run Google Business Profiles for UK trades: the reviews, the replies, the posts and the pages that get you on the map. Local SEO and Google Business Profile work is paid on results, with nothing upfront.

5.0 from 6 Google reviews