Paving calculator for patios and slabs

Enter the patio size and the slab size to get the slabs to order, the Type 1 underneath, the sand and cement for a full mortar bed and the jointing compound. Free, no account, and none of your figures are sent to Business Opt.

  • 600×600, 600×900, 450×450 or your own size
  • Sub-base, mortar bed and jointing in one go
  • Mixes and depths from Marshalls and Bradstone

Enter the patio length and width in metres, then pick the slab size.

Slab size
Does the slab size already include the joint?
Mortar bed mix (sand : cement)
64 slabsfor 21.6 m², with 10% for cuts
5.23 tType 1 sub-base, 100mm (7 × 800kg bags)
13 × 25kgCement for a 40mm bed (314 kg)
1.26 tSharp sand for the bed
2 × 15kgJointing compound tubs
The working
Patio area21.6 m²
Mortar bed, 40mm0.864 m³
Sub-base: area × 0.1m × 1.1 × 2.2 t/m³5.23 t

Laying method from Marshalls' and Bradstone's guides. Fall the patio away from the house, and keep it 150mm below the damp-proof course.

A patio, from the stone up

The calculator works out four things from one area. The slabs: how many fit, counting each slab plus one joint, then your wastage on top. The sub-base: 100mm of Type 1, plus 10%, weighed at 2.2 t/m³ compacted. The bed: 40mm of mortar, converted to tonnes of sharp sand and bags of cement for your chosen mix. The joints: their total volume, turned into tubs of jointing compound.

Worked example: a patio 6m by 3.6m in 600 × 600mm slabs, 22mm thick, with 10mm joints and 10% wastage. Every other setting is left at its default.

  • Area: 6.0 × 3.6 = 21.6m².
  • Slabs: each takes 0.61 × 0.61 = 0.3721m², so 21.6 ÷ 0.3721 = 58.05 laid. Plus 10% = 63.85, so 64 slabs.
  • Type 1: 21.6 × 0.100 = 2.16m³, plus 10% = 2.376m³, × 2.2 = 5.23 tonnes. That is 7 bags of 800kg, or 6 tonnes loose.
  • Mortar bed: 21.6 × 0.040 = 0.864m³. Each m³ of bed takes 1,820kg of dry materials, so that is 1,572kg. At 4:1, cement is one part in five: 314.5kg, so 13 bags. Sharp sand is the other four parts: 1.26 tonnes.
  • Jointing: the joints run about 3.25m per m² of patio. At 10mm wide and 22mm deep, that is 0.0155m³ across the patio, so 2 tubs of 15kg.

How many slabs per square metre

With 10mm joints, a square metre takes 2.69 slabs of 600 × 600mm, 1.80 of 600 × 900mm and 4.73 of 450 × 450mm. Without the joint you would expect 2.78, 1.85 and 4.94, so ignoring the gap over-orders by about 3 to 5%.

Check how the maker states its sizes before you trust any count. Marshalls' garden paving technical information says that for its natural stone, including Indian sandstone, sizes and coverage are those attained when laid with a 10mm joint. So a "600 × 600" sandstone slab is a little under 600mm, and 1m² really does take 2.78 of them. For some of its concrete ranges the sizes are actual and do not include the joint.

The calculator has a switch for this. Answer Yes to "Does the slab size already include the joint?" and it divides by the slab size alone. On the 6m by 3.6m patio that changes the order from 64 slabs to 66.

On wastage, 10% is our starting point, not a published standard. Lower it for a square patio that fits whole slabs. Raise it for curves, a diagonal pattern or a lot of cutting round drains and steps.

600 × 600mm

2.69 per m² with 10mm joints. The common size for sandstone and porcelain. A pack of 38 Marshalls Indian sandstone slabs at Wickes is sold as covering 13.72m².

600 × 900mm

1.80 per m² with 10mm joints. Fewer joints and a faster lay, but heavier to handle and harder to cut round curves.

450 × 450mm

4.73 per m² with 10mm joints. Easier to lift and level on your own. More joints means more jointing compound per m².

The mortar bed: mix and depth

Lay slabs on a full bed of mortar, between 30mm and 40mm thick, mixed from sharp sand and cement. The makers agree on the full bed. They differ on the mix, from 3:1 to 6:1.

Marshalls' patio laying guide makes an even 40mm layer of three parts sand to one of cement. Its sandstone guide uses four parts sand to one of cement at about 30mm, and its porcelain guide specifies a wet, workable 1:4 bed 30 to 40mm thick with a primer on the back of every slab. Bradstone's step-by-step patio guide uses 6 parts sharp sand to 1 part cement, under the whole slab and not just the corners.

The calculator defaults to 40mm at 4:1, and offers 3:1 and 6:1. To turn the wet bed into dry materials, it allows 1,820kg of dry mix for every m³ of bed, worked out from the yield on Hanson's sand and cement mortar data sheet. Tapping each slab down squeezes some of the bed out at the edges, so do not trim the order below this.

Five dabs of mortar under each corner and the middle is quicker, and it is what goes wrong. Marshalls says porcelain must never go on a five spot bed. Hollow slabs rock, crack and let water sit underneath.

3:1, Marshalls patio guide

The strongest of the three. On the 21.6m² example at 40mm: 393kg of cement, so 16 bags, and 1.18 tonnes of sharp sand.

4:1, the default

Marshalls' mix for sandstone and porcelain. On the example: 13 bags of cement and 1.26 tonnes of sharp sand.

6:1, Bradstone guide

A leaner, damp mix. On the example: 225kg of cement, so 9 bags, and 1.35 tonnes of sharp sand.

Sub-base, digging and falls

Under the bed goes 100mm of compacted Type 1 on most domestic patios. That is the depth in Marshalls' porcelain and sandstone guides, and the default here. The Type 1 calculator explains the depth choices and why its tonnes differ from other sites. Bradstone's own guide uses a 75mm layer of concrete, 6 parts all-in ballast to 1 of cement, as the foundation instead.

Marshalls' patio guide digs out about 150mm across the whole area. Bradstone allows 150mm for the foundation and the paving. Next to a house, both makers set the finished paving 150mm or more under the damp proof course, so the dig there can reach 300mm below it.

Build in a fall so rain runs away from the house. Bradstone uses 1 in 60: a 3m wide patio drops 50mm across its width. Marshalls' porcelain guide asks for at least 1 in 80 along the patio and 1 in 40 across it. Set the fall in the sub-base, so the mortar bed stays an even thickness.

How much jointing compound

Jointing compound coverage depends on the joint, not the patio. Marshalls' jointing range guide gives a 15kg tub of WeatherPoint 365 about 7m², for 10 to 15mm joints, and says that figure is based on 450 × 450mm paving with 10mm joints 35mm deep.

That works out at about 0.0107m³ of joint per tub, and the calculator uses it. It multiplies the length of joint per m² by the joint width and the slab thickness, then rounds up to whole tubs. So 22mm sandstone in 600 × 600mm with 10mm joints gets nearly 15m² from a tub, about twice the headline figure. Wider joints, thicker slabs or smaller slabs use more.

Fill the joints to the full depth of the slab. Marshalls gives a minimum joint depth of 20mm for paving, and a minimum laying temperature of 5°C and rising for WeatherPoint 365. Porcelain is different: Marshalls specifies 3 to 5mm joints and its own jointing, and with its Symphony jointing, drainage ports through the bed. If you point with mortar instead, Bradstone uses 3 parts soft building sand to 1 of cement, pressed into the joints with a trowel and kept off the face of the slabs.

Before you order

The calculator gives quantities for a rectangle. For an L-shaped patio, run each rectangle separately and add them. For a curve, measure the rectangle round it and raise the wastage.

Quoting this for a client? The quote template takes the slabs, Type 1, sand, cement and labour line by line, and lets you say how long the price holds.

  • Not included: edgings, kerbs, a geotextile membrane, slurry primer, drainage channels and the skip for the spoil.
  • Primer: Marshalls asks for its paving primer on natural stone and porcelain. Budget for it.
  • Batches: natural stone varies in colour. Buy the full quantity at once and mix slabs from several packs as you lay.
  • No prices. Slab and sand prices vary by merchant and by region. Ask for a quote.

Common questions

How many paving slabs do I need?

Divide the patio area by the area of one slab plus its joint, then add wastage and round up. For 600 × 600mm slabs with 10mm joints that is 2.69 per m², so a 21.6m² patio needs 58 laid and 64 to order at 10% extra.

How many 600 × 600 slabs are in 1m²?

2.78 if the 600mm already includes the joint, as Marshalls states for its natural stone. 2.69 if the slab itself is 600mm and you add a 10mm joint.

What quantity of sand and cement does a patio need?

For a 40mm bed at 4:1, allow about 14.6kg of cement and 58kg of sharp sand per m², from 0.04m³ of mortar. A 20m² patio is roughly 12 bags of cement and 1.2 tonnes of sand.

What is the best mortar mix for laying paving slabs?

Marshalls uses 4:1 sharp sand to cement for sandstone and porcelain, and 3:1 in its general patio guide. Bradstone uses 6:1. Follow the maker of your slabs, and use sharp sand, not building sand, for the bed.

How thick should the mortar bed be under slabs?

Between 30mm and 40mm. Marshalls' porcelain guide gives 30 to 40mm, its sandstone guide about 30mm and its patio guide 40mm.

How deep do I dig for a patio?

About 150mm for 100mm of Type 1, a 30 to 40mm bed and the slab. Add more for thicker slabs or soft ground. Next to the house, the finished patio must sit at least 150mm below the damp proof course.

How many tubs of jointing compound will a patio take?

Marshalls' WeatherPoint 365 covers about 7m² per 15kg tub on 450 × 450mm slabs with 10mm joints 35mm deep. Thinner slabs and larger formats use less, so a 22mm 600 × 600mm patio gets about 15m² per tub.

Can I lay slabs on sand or on spots of mortar?

Not to the makers' guidance. Marshalls and Bradstone both specify a full mortar bed under the whole slab, and Marshalls says porcelain must never go on a five spot bed.