Skip to content
Business Opt

Websites for electricians that win the next board change.

For electricians and electrical contracting firms who want more booked work from Google: EICRs, EV chargers, rewires and commercial jobs as well as call-outs. We give each type of job its own page and say plainly which certificate the customer gets. The website is priced separately once your free analysis is done. Local SEO on top of it costs nothing upfront and is paid on results.

  • The site is quoted. Local SEO is paid only on agreed results
  • One electrician per area. Your nearest rival gets turned away
  • GS Renovation, built by us: Google clicks +123%, July to September 2026

5.0 from 6 Google reviews

+123%more clicks from Google search

George, GS RenovationRSJ and renovations, London

July to September 2026. Source: Google Search Console.

Read the full story

The sites we have built, and what Google measured.

All client results

There is no electrical result to show, as no electrician is a client of ours yet. Two of these firms sell planned work that is quoted before it is booked, as a rewire or a charger install is. The third, a Norwich garage, also takes the drop-in and urgent jobs an electrician knows as call-outs. All three run live sites we built that carry our credit. Each figure counts our work on the site and the Google Business Profile together, from the first month we tracked to the best month since, using Google's complete monthly data.

+160%

more clicks from Google search, for jobs quoted at the customer's home first

Matt, ColourHauskitchen and uPVC spraying, Leeds

June to September 2026. Source: Google Search Console.

Read the full story

110 to 173

calls a month from the Google Business Profile, for drop-ins and booked repairs alike, up 57%

Ash, Norwich Tyres & Auto Servicestyres, servicing and repairs, Norwich

May to August 2026. Source: Google Business Profile.

Read the full story

None of the three does electrical work. An electrician's figures will go here once one is a client and has agreed to publish them.

What does a customer want to know before ringing an electrician?

Whether you do their job, what paperwork they will get, and whether you are on a register they can search. We build an electrician's site around those answers. We give every kind of job a page of its own, name the certificate on it, and link your registration from it.

One long services page can't do that. A board change, a landlord's report, a charger on a driveway and a warehouse contract are bought by different people for different reasons, and each ends with different paperwork. So each page is written for one of them. Ranking those pages is the other half of the job, covered on SEO for electricians; for the do-it-yourself version, start with Local SEO for electricians, our free guide.

Call-outs get a page too, and it should give an honest arrival range for the patch you cover. The site we built for Fast Tyre, a 24/7 mobile tyre firm in London, puts its typical arrival range in its opening lines. It also explains what moves a job to either end of that range. A no-power call deserves the same straight answer. For most electricians, that adds up to these pages:

  • Consumer unit replacement and rewires
  • Fault finding and emergency call-outs
  • EICRs for landlords and letting agents
  • EV charger installation
  • Commercial and contract work, where your registration covers it

Is your area still open?

Free. A short video of where you rank, who is above you and what it would take, within two working days.

We use your details to prepare your analysis and contact you about it by WhatsApp, phone and email. See our privacy policy.

What should a consumer unit or rewire page promise on paper?

Which documents the customer gets, and when. A registered installer completes a BS 7671 certificate for every job and gives it to whoever ordered the work. When the job is notifiable in England, a board change or a new circuit for example, the occupier is also owed a Building Regulations compliance certificate. It comes from the installer or the scheme they belong to, within 30 days of finishing (Approved Document P, section 3).

Use the names the customer will see on the paperwork. NICEIC's help pages tell householders to expect an Electrical Installation Certificate after a new circuit, a new consumer unit or a rewire. Smaller alterations, such as moving a socket, get a Minor Works Certificate. The same pages tell them to complain if a building regulations certificate has not arrived after a month (NICEIC). So say on the page when yours will arrive.

Say what hiring you saves them, too. With an unregistered installer, notifiable work has to be inspected through a third-party certifier or a building control body instead. The register's own site points out that those routes involve a further payment for the inspection (Electrical Competent Person).

In Wales the list of notifiable work is longer. The Welsh Government's Approved Document P still counts extending a circuit in a kitchen, and new outdoor work such as garden lighting, as notifiable. So a kitchen or garden page written for Welsh customers needs the certificate on it, where an English one might not.

How should your website use the electrical register?

Send customers to the search they would use anyway, and make sure it finds you. The Registered Competent Person Electrical register covers England and Wales. On it, a householder enters a postcode and chooses between two lists: firms for installation or remedial work, and firms for an electrical safety report, including landlords' checks. A second box checks whether a named company is registered (Electrical Competent Person).

Build the site along the same line. Keep your installation pages apart from your safety report pages, and say on each one which kind of work your registration covers. A landlord on your EICR page needs to see that you are listed for reports as well as for installing.

Link your own entry from those pages. NICEIC's search finds certified firms by name or postcode and is updated every 24 hours, and its advice to landlords is to look for 'Rental Safety Report' among a firm's schemes (NICEIC). If that appears on your listing, say so on the EICR page and link to it.

Scotland is different again. That register covers England and Wales only, and Scottish Government guidance lets landlords rely on SELECT, NICEIC or NAPIT membership when choosing who inspects (gov.scot). If you work in Scotland, name the body you belong to and link to where a landlord can look you up.

What should an EICR page tell a landlord?

What the codes on the report mean, what happens after a failed one, and which nation's rules apply to their property. Write it for letting agents too, since they arrange checks for the landlords they work for.

Start with the codes, because they decide the landlord's next bill. A C1, C2 or FI makes the report unsatisfactory. A C3, improvement recommended, does not, and a report with only C3s is satisfactory (Electrical Competent Person).

Then answer what landlords ask next. NICEIC tells them a new check is not needed at every change of tenancy unless the last report asked for one sooner. It also tells them that once the faults are fixed, they get a certificate for the remedial work rather than a fresh report (NICEIC).

Last, the paperwork. All three nations work to a five-year cycle, but the rules around it change at each border:

  • England: the landlord has to hand the last report to whoever carries out the next one, so your booking form can ask for it (2020 regulations).
  • Wales: the contract-holder, Welsh law's word for the tenant, must have a copy within 7 days of the inspection, or of moving in (2022 regulations).
  • Scotland: the visit also covers testing the appliances the landlord supplies, and the guidance says those appliances usually need retesting before the five years are up (gov.scot).

What does an EV charger page need while the grants last?

Who can get a grant, the order things have to happen in, and a reason to book you that still works after the grants end. The government has extended its home and workplace chargepoint grants for what it calls a final year, to 31 March 2027 (GOV.UK).

Say early that a homeowner with a house and a driveway doesn't qualify. The household grant is for people who rent, or who own and live in a flat, and have private off-street parking. Separate grants cover homes with only on-street parking, through a cross-pavement solution, as well as residential landlords and workplaces (GOV.UK).

Set out the order of events as well. The installer makes the claim and must be authorised by OZEV, the Office for Zero Emission Vehicles (GOV.UK). The customer must not have the charger fitted until OZEV has confirmed they are eligible (GOV.UK). Put that above the quote form.

Then give reasons to book you that outlast the grants. Link the charger page to your certificate page: when a charger needs its own new circuit, that circuit makes the job notifiable, and the 30-day certificate applies. And say which chargers you fit: home and workplace chargers sold in Great Britain since 30 June 2022 must be smart, with off-peak charging hours set by default that the owner can change (GOV.UK).

Should domestic and commercial work have separate pages?

Yes, if you do both. A homeowner is deciding who to let into the house. A facilities manager is choosing an electrical contractor who can work around a business that has to keep trading, and wants to see buildings like theirs. Those are different pages, and the registration behind each one can be different too.

Check what your registration covers before a commercial page goes live. NICEIC certifies domestic installations and Part P work under its Domestic Installer scheme, and commercial and industrial installations under its Approved Contractor scheme (NICEIC). It also tells householders that a certified firm can only issue NICEIC-branded certificates for the work its scheme covers (NICEIC).

The chargepoint grants draw the same line. OZEV accepts different scheme registrations for workplace chargers than for home ones, so a commercial EV page should name the registration you hold for that work (GOV.UK).

Keep the compliance claims accurate. HSE says the Electricity at Work Regulations 1989 require equipment to be kept safe, but do not say how that should be done or how often. So PAT testing is not a legal yearly duty (HSE). Offer a testing schedule set by how the equipment is used, which is the risk-based approach HSE describes.

The site is quoted. The SEO is paid on results.

Websites, ads and social media are quoted separately after the free analysis. Local SEO and Google Business Profile work is paid on results. There is nothing to pay upfront: you pay nothing until the results we agree with you in writing, before we start, have been met.

Agreed in writing first
What counts as a result, and how it is measured, is set before any work starts.
One business per trade, per area
If we take you on, we turn down your competitors.
No lock-in
After the result, a rolling monthly fee you can stop whenever you like. Leave before it and you owe nothing.
Straight answers
If your market is not winnable, the free analysis says so.

From first call to first result

  1. Free analysis

    Tell us your trade and area. We record a short video of where you rank, who is above you and what would have to change. It is yours to keep.

  2. An honest answer

    If your market is not winnable, we say so. If it is, we agree in writing what a result is and how it is measured, before anything starts.

  3. The work

    Your Google Business Profile, the pages that need to rank, citations and reviews. One business per trade per area, so never your rival as well.

  4. You see every number

    Clicks, calls and where you show up, in your own portal, straight from Google. Any SEO on top is paid once the agreed results are met.

What people ask us

Have you built a website for an electrician before?

Not for an electrical contractor, and no electrician has signed up for an area so far. The closest is a site for EliteShires, which sells landlords' certificates around Harrow, and it has no figures we can show. The results above come from sites we built for other trades. What carries across is the method on this page: one page per job, the paperwork named, the register linked. The free analysis shows what the electricians ranking near you have done, so you can judge whether it would work in your area.

What does an electrician's website cost?

There is no price on this page because no two electricians need quite the same site. The quote depends on how many kinds of work need a page and whether commercial work needs pages of its own. It also depends on which nations of the UK you work in and whether you have photos of your own jobs. You get the quote after your free analysis, and nothing starts until you accept it. That quote is for the website. Local SEO and Google Business Profile work is paid on results: there is nothing to pay upfront, and you pay nothing until the results we agree with you in writing, before we start, have been met.

Can I show the NICEIC or NAPIT logo on my website?

Only if you are registered with that scheme, and only for the work your registration covers. Link the logo to your entry on the scheme's own search, so a customer can confirm it for themselves. NICEIC treats a firm that claims to be certified but is not as misusing its logo, and asks anyone with evidence to send it in (NICEIC).

What is the best website builder for electricians?

The one you will keep up to date. Wix, Squarespace and WordPress can all run a good electrician's site, and our comparison for trades sets out the trade-offs. Whether it brings in work depends on what goes on it: separate job pages, the right certificates named and a registration that can be checked. That writing is most of the effort, whichever builder you choose.

Should I put prices on my EICR or EV charger pages?

That is your decision. If you do, say exactly what the figure covers, such as the size of property, and what would change it. On a charger page, show the price with and without any grant and say who the grant is for, so nobody books expecting money they can't claim.

Should I have a page for each town I work in?

No. A clear list of the places you work, matching the service area on your Google profile, does the job (how service areas work). Pages that repeat the same text with a different town name risk what Google's spam policies call doorway abuse. Its examples include pages aimed at particular cities that funnel visitors to one place (Google). Spend the time on the job pages instead.

I already have a website. Will I have to replace it?

Not necessarily. If it's in good shape, we build on it, even if another firm made it. We add the job pages it is missing, because pages that already bring in calls are worth keeping. If it needs rebuilding, the analysis video says so and explains why. What to check before a rebuild.

Who owns the website if I stop working with you?

Your domain is yours. If we registered it, it moves into your name when you ask, once your account is paid up. On the same terms, we hand over the site's files and help you move hosts. Text and images made for your business are yours to keep using once they're paid for. Our hosting runs for 30 days after the work ends unless we agree a different date.

Could another electrician near me hire you too?

No. For as long as you're with us, no other electrician in the area we agree at sign-up can hire us, for a website or anything else.

Find out who Google shows for your jobs.

Your free video shows which electricians come up for the jobs you want, what their sites have that yours lacks, and whether you need a new site at all. If yours only needs a few pages adding, we will say that instead.

5.0 from 6 Google reviews